Had my RR done and my XLT…. Both went fine with no issues. Took about 1 1/2 days for RR and almost 2 for XLT due to those pesky p.o.s. Plastic clips had a couple failures so they were replaced.
🦖
Dropped my RR off at 8am this morning…. Shop started on it at 0830. Still not finished. Called shop and SM said that t would be sometime tomorrow morning….. cheez, didn’t think it was that hard?
🦖
Would be very interested in a bed rack that can be attached on the back 2/3rds of the bed and the height is equal to the height of the cab. I have a toolbox that is 19” back from the front of the baed and then I have a homemade bi-fold hard tonneau cover.
🦖