Nice! Wish guys the best on getting your trucks quickly.Haven't gotten the email yet but just checked the tracker and it shows built! with an estimated delivery of 9/22-9/28 with any luck it could be faster
Makes sense. The only option I added to my truck was the door entry keypad. No BL wheels / No bed liner. Not sure if this helps.My dealer had two RR ordered, one in April, the other in June. June order scheduled week of 9/9, in production 9/10, built 9/12. April order scheduled week of 9/2, in production 9/7, no built status. Only difference is BL wheel option on April order vs. Non BL wheel on June order. This might be the difference in why the later order is built and the easier is not. Anyone have any thoughts?
Much appreciated.Makes sense. The only option I added to my truck was the door entry keypad. No BL wheels / No bed liner. Not sure if this helps.
I think the "desired normal" would be a couple or few days for QA, protection, shipping logistics, whatever, but these QA holds happen.Update still not shipped and each day the tracker's estimated delivery window gets pushed back a day, growing more impatient with each day. How long between built and shipped is normal?