Sponsored

Can change order after assigned VIN! Sandstone leather in video!

nswilliams

Active Member
First Name
Norman
Joined
Jan 17, 2024
Threads
6
Messages
28
Reaction score
52
Location
Florida
Vehicle(s)
2024 Ranger Lariat 4/19/24
Occupation
Senior Research Engineer
My build date is 3/11 and I asked my dealer if they can change few orders. They checked with manager and said yes as long the changes are made two weeks before build date.

So I changed the interior to sandstone instead of black for my 24 Lariat. I kept the catus gray body color.

If you are looking for a video with sandstone (hard to find), here is the link:

Sponsored

 

CACTUSGREYFX4

Well-Known Member
First Name
Pat
Joined
Jun 13, 2023
Threads
5
Messages
1,622
Reaction score
1,471
Location
ON, Canada
Vehicle(s)
2024 Ford Ranger Lariat FX4
Occupation
Fire Dept Dispatcher
I didn't change mine, I ordered it right away with the sandstone interior thought it would be a little cooler in summer time than a black interior.
 
OP
OP
nswilliams

nswilliams

Active Member
First Name
Norman
Joined
Jan 17, 2024
Threads
6
Messages
28
Reaction score
52
Location
Florida
Vehicle(s)
2024 Ranger Lariat 4/19/24
Occupation
Senior Research Engineer
I never saw a real sandstone in a video until now. By the way we now have same body color of cactus gray and sandstone leather. ?
 

Cyrusblack

Banned
Banned
First Name
John
Joined
Dec 30, 2023
Threads
18
Messages
400
Reaction score
443
Location
Pasco County
Vehicle(s)
2024 Ford Ranger Lariat Oxford White \ Sandstone
Occupation
Chief Executive Officer of Pencil Sharpening
My build date is 3/11 and I asked my dealer if they can change few orders. They checked with manager and said yes as long the changes are made two weeks before build date.

So I changed the interior to sandstone instead of black for my 24 Lariat. I kept the catus gray body color.

If you are looking for a video with sandstone (hard to find), here is the link:

I ordered my Lariat in Oxford white with sandstone from the get go
Sponsored

 
 







Top