nswilliams
Member
- Thread starter
- #1
My build date is 3/11 and I asked my dealer if they can change few orders. They checked with manager and said yes as long the changes are made two weeks before build date.
So I changed the interior to sandstone instead of black for my 24 Lariat. I kept the catus gray body color.
If you are looking for a video with sandstone (hard to find), here is the link:
So I changed the interior to sandstone instead of black for my 24 Lariat. I kept the catus gray body color.
If you are looking for a video with sandstone (hard to find), here is the link:
Sponsored