• Welcome to Ranger6G.com everyone!

    If you're joining us from Ranger5G, then you may already have an account here! As long as you were registered on Ranger5G as of March 27, 2020 or earlier, then you can simply login here with the same username and password.

Sponsored

Who has an order in for a Ranger 2.7L V6? Build date?

BriSco

Member
First Name
Brian
Joined
Mar 25, 2024
Threads
1
Messages
8
Reaction score
3
Location
De Soto, KS
Vehicle(s)
24 XLT 4x4 2.7L Cactus Gray. Ordered 4/30
Occupation
Retired
My order went in Friday 5/3.

Please post your build date when you get it.
Sponsored

 

GFran

Member
First Name
Glenn
Joined
Mar 19, 2024
Threads
0
Messages
16
Reaction score
10
Location
Baytown, Tx
Vehicle(s)
2011 F150 FX2
Occupation
Safety Manager
My order went in Thursday May 2nd, on the 2.7 V6 Lariat, haven’t received a build date yet.
 

chiron027

New Member
Joined
May 2, 2024
Threads
0
Messages
4
Reaction score
0
Location
St. Louis
Vehicle(s)
2011 Highlander, 2024 Lariat on order
Order in today, 5/7.
 
Joined
Apr 10, 2024
Threads
0
Messages
13
Reaction score
5
Location
Oregon
Vehicle(s)
Lariat on order.
My order went in Friday 5/3.

Please post your build date when you get it.
Did any of you have a 2.3 on order with a build date (6/3) and a VIN number ? Did dealer let you cancel that order to reorder a 2.7 ?
 

Sponsored
OP
OP
BriSco

BriSco

Member
First Name
Brian
Joined
Mar 25, 2024
Threads
1
Messages
8
Reaction score
3
Location
De Soto, KS
Vehicle(s)
24 XLT 4x4 2.7L Cactus Gray. Ordered 4/30
Occupation
Retired
I did, dealer said don’t cancel. Build date was 6/3. Dealer didn’t care. Said I will have first right of refusal when the first truck comes in. If I don’t want it they will sell it. I have no deposit down on either, so no issue.
 

GFran

Member
First Name
Glenn
Joined
Mar 19, 2024
Threads
0
Messages
16
Reaction score
10
Location
Baytown, Tx
Vehicle(s)
2011 F150 FX2
Occupation
Safety Manager
My order went in Thursday May 2nd, on the 2.7 V6 Lariat, haven’t received a build date yet.
Update, I was told today my order Priority Code is 3. Which means the lower the number, it’s about to be scheduled for build. Thanks
Sponsored

 
 




Top