• Welcome to Ranger6G.com everyone!

    If you're joining us from Ranger5G, then you may already have an account here! As long as you were registered on Ranger5G as of March 27, 2020 or earlier, then you can simply login here with the same username and password.

Sponsored

Ranger 2.7L V6? What is your build date?

AlpineBike

Well-Known Member
First Name
Andrew
Joined
Mar 29, 2024
Threads
3
Messages
411
Reaction score
491
Location
Waitsfield, VT
Vehicle(s)
2024 Ranger Raptor
Good! 👍🏽

Awesome! Thank you so much for sharing this very important information.

My Ranger Lariat Azure Gray went into production July 31st. Haven’t seen any updates present time.
I ordered mine the day the order banks opened in 2023.
Went into production on 2/3/24.
It showed up at the dealer finally on 8/4…
Sponsored

 
OP
OP
BriSco

BriSco

Well-Known Member
First Name
Brian
Joined
Mar 25, 2024
Threads
6
Messages
163
Reaction score
129
Location
Kansas
Vehicle(s)
'24 Ranger XLT, 2.7L V6
Occupation
Retired
My build date was 8/12 and as of this morning (8/8) it was pushed out to 8/26. If this happens again, I may be looking at a 25'.
My 7/22 date was pushed to 8/19. Not unhappy at all, I hope they get the 2.7 build issues worked out before they build mine…
 

LeeHo

Well-Known Member
First Name
Lee
Joined
Jun 6, 2024
Threads
4
Messages
111
Reaction score
60
Location
Niles, Mi.
Vehicle(s)
Lincoln MKZ - Ranger Lariat w/2.7L Sport 4x4 Azure
Not sure what may have delayed it.. One identical to mine (Azure Grey) went into podruction 8/5 part they ran out of for mine. Several Azure Grey 2.7l went into production 8/5. Mine has has the
2.7 V6 Lariat Azure Gray
Just Curious - Does it have the FX4 package?
 

GFran

Well-Known Member
First Name
Glenn
Joined
Mar 19, 2024
Threads
0
Messages
81
Reaction score
63
Location
Baytown, Tx
Vehicle(s)
2011 F150 FX2
Occupation
Safety Manager
Not sure what may have delayed it.. One identical to mine (Azure Grey) went into podruction 8/5 part they ran out of for mine. Several Azure Grey 2.7l went into production 8/5. Mine has has the

Just Curious - Does it have the FX4 package?
Mine does not have the off-road package. Just a regular 4X4.
 

LeeHo

Well-Known Member
First Name
Lee
Joined
Jun 6, 2024
Threads
4
Messages
111
Reaction score
60
Location
Niles, Mi.
Vehicle(s)
Lincoln MKZ - Ranger Lariat w/2.7L Sport 4x4 Azure
Not sure what may have delayed it.. One identical to mine (Azure Grey) went into production 8/5. Mine was 8/12. Several Azure Grey 2.7l went into production 8/5. Mine has has the Electronic-locking rear differential but not the FX4 package.
Mine does not have the off-road package. Just a regular 4X4.
Thanx!
 

Sponsored

LeeHo

Well-Known Member
First Name
Lee
Joined
Jun 6, 2024
Threads
4
Messages
111
Reaction score
60
Location
Niles, Mi.
Vehicle(s)
Lincoln MKZ - Ranger Lariat w/2.7L Sport 4x4 Azure
My 7/22 date was pushed to 8/19. Not unhappy at all, I hope they get the 2.7 build issues worked out before they build mine…
Good point!
 

1986YellowRanger

Well-Known Member
Joined
Aug 2, 2023
Threads
6
Messages
150
Reaction score
256
Location
Ohio
Vehicle(s)
Edge
I posted this in another thread, but thought it relevant here as well:

My order went into production last week and my Blend Date was yesterday (8/7) per the pizza tracker. Out of curiosity, I searched AutoTrader for 2.7L Rangers and found a few listed as "in transit" to dealerships. I then picked four of those and found the window sticker to pull the order number. With the VIN and order number for those four trucks, I was able to pull them up on the pizza tracker as well. None of the four trucks I picked have been shipped from the factory. Of those four, the first VIN with a "Built" date in the pizza tracker was yesterday (8/7), and that truck has not shipped. The Blend Date for that truck was 8/5.

For those not aware, the truck will go into production, then a few days later you will see a date added next to your "in production" date. The date added is your "Blend Date." This is the day the truck starts down the final assembly line. The final assembly line takes a shift or two, but your "built" date could be a couple days or more after your Blend Date. On rare occasions you could even see weeks between your Blend Date and built date.
Current update as of 8/13... Three of the four trucks I am tracking have been built, none of the three have shipped yet.
 

PhoenixRanger

Well-Known Member
First Name
R
Joined
May 6, 2024
Threads
2
Messages
129
Reaction score
91
Location
Phoenix Arizona
Vehicle(s)
Bronco 2 dr. OB/AMB 2.7L, Ranger Raptor Carbonized Grey
My build date for a 2.7 XLT FX4 with tow and tech pkg was supposed to be this week. It’s been pushed out to the week of 8/26. It is my understanding that those of us with a VIN and build date will be MY2024, not 2025. And I’m fine waiting a few extra weeks or even months.
 

Sponsored

6G powwaa

Member
First Name
Rick
Joined
Jun 19, 2024
Threads
0
Messages
7
Reaction score
2
Location
Illinois
Vehicle(s)
(soontobe) 2024 Ranger
Occupation
Ford
My build date for a 2.7 XLT FX4 with tow and tech pkg was supposed to be this week. It’s been pushed out to the week of 8/26. It is my understanding that those of us with a VIN and build date will be MY2024, not 2025. And I’m fine waiting a few extra weeks or even months.

Still waiting for a production date. My order confirmation was 7/10 for 2.7 XLT 4x4, 301a, bedliner, LRD, running boards. I have yet to receive any other information or even get to the pizza tracker. Hopefully I'll be able to get more information soon.
 

GFran

Well-Known Member
First Name
Glenn
Joined
Mar 19, 2024
Threads
0
Messages
81
Reaction score
63
Location
Baytown, Tx
Vehicle(s)
2011 F150 FX2
Occupation
Safety Manager
Current update as of 8/13... Three of the four trucks I am tracking have been built, none of the three have shipped yet.
Where are you finding this info? I tried to the exact thing you posted and couldn’t near the information you displayed. Lol
 

GFran

Well-Known Member
First Name
Glenn
Joined
Mar 19, 2024
Threads
0
Messages
81
Reaction score
63
Location
Baytown, Tx
Vehicle(s)
2011 F150 FX2
Occupation
Safety Manager
I posted this in another thread, but thought it relevant here as well:

My order went into production last week and my Blend Date was yesterday (8/7) per the pizza tracker. Out of curiosity, I searched AutoTrader for 2.7L Rangers and found a few listed as "in transit" to dealerships. I then picked four of those and found the window sticker to pull the order number. With the VIN and order number for those four trucks, I was able to pull them up on the pizza tracker as well. None of the four trucks I picked have been shipped from the factory. Of those four, the first VIN with a "Built" date in the pizza tracker was yesterday (8/7), and that truck has not shipped. The Blend Date for that truck was 8/5.

For those not aware, the truck will go into production, then a few days later you will see a date added next to your "in production" date. The date added is your "Blend Date." This is the day the truck starts down the final assembly line. The final assembly line takes a shift or two, but your "built" date could be a couple days or more after your Blend Date. On rare occasions you could even see weeks between your Blend Date and built date.
I posted this in another thread, but thought it relevant here as well:

My order went into production last week and my Blend Date was yesterday (8/7) per the pizza tracker. Out of curiosity, I searched AutoTrader for 2.7L Rangers and found a few listed as "in transit" to dealerships. I then picked four of those and found the window sticker to pull the order number. With the VIN and order number for those four trucks, I was able to pull them up on the pizza tracker as well. None of the four trucks I picked have been shipped from the factory. Of those four, the first VIN with a "Built" date in the pizza tracker was yesterday (8/7), and that truck has not shipped. The Blend Date for that truck was 8/5.

For those not aware, the truck will go into production, then a few days later you will see a date added next to your "in production" date. The date added is your "Blend Date." This is the day the truck starts down the final assembly line. The final assembly line takes a shift or two, but your "built" date could be a couple days or more after your Blend Date. On rare occasions you could even see weeks between your Blend Date and built date.
Ford Ranger Ranger 2.7L V6? What is your build date? IMG_0644
 

1986YellowRanger

Well-Known Member
Joined
Aug 2, 2023
Threads
6
Messages
150
Reaction score
256
Location
Ohio
Vehicle(s)
Edge
Still waiting for a production date. My order confirmation was 7/10 for 2.7 XLT 4x4, 301a, bedliner, LRD, running boards. I have yet to receive any other information or even get to the pizza tracker. Hopefully I'll be able to get more information soon.
Where are you finding this info? I tried to the exact thing you posted and couldn’t near the information you displayed. Lol
You can get the order number / VIN off of any truck with a window sticker available on the dealer’s website.
Current update as of 8/13... Three of the four trucks I am tracking have been built, none of the three have shipped yet.
First of the four was shipped and delivered via convoy to a Michigan dealer yesterday! 2.7L Rangers are officially on the road!
Sponsored

 
 







Top