cboggs
Well-Known Member
I have the exact same blend date 20240108. What does this mean? I tried searching but couldn’t find a clear answer.I think mine said it was coming by Convoy
Sponsored
I have the exact same blend date 20240108. What does this mean? I tried searching but couldn’t find a clear answer.I think mine said it was coming by Convoy
I think out trucks are brothers...what's the production sequence #/# on your window sticker up left of the vin#? I'm 16/61I have the exact same blend date 20240108. What does this mean? I tried searching but couldn’t find a clear answer.
I believe blend date is when the body and chasis are joined together. Others can confirm.I have the exact same blend date 20240108. What does this mean? I tried searching but couldn’t find a clear answer.
Unless I’m looking at the wrong thing, it says 712/750I think out trucks are brothers...what's the production sequence #/# on your window sticker up left of the vin#? I'm 16/61
I think out trucks are brothers...what's the production sequence #/# on your window sticker up left of the vin#? I'm 16/61
Blend date 1/29. 20/102Mine is 15/121. I've yet to see anyone with the same blend date. Would be cool to see some numbers from the same build day.
My ramp one is RU2G Rail Item # 16-4048 O/T 1This is what mine says:
mine is 02/01 and 114/117Mines 03/04 and 109/127
It was explained that the first number was the place your vehicle came down the line that day and the second was the total number for that day. In this case would be total for 2 shifts, if they were running 2, and total of all types, both Ranger and Bronco. Early days in January had low numbers like mine on Jan 8 (61), maybe only 1 shift till the bugs were worked out (61 was the lowest number i saw, hope mine is ok) and as they ramped up the numbers went over 1000. Now with the F150 Lightning plant curtailed and workers moving to MAP, there could be 3 shifts...I am thinking that the xxx/xxx is more of a lot or batch number. I've seen the second number be really high, as in more than they could make in a day and I've seen the number really low like 114/117. Unless they stopped production or something in a day '117' is really low for a day.
But, if the 117 was a lot or batch of vehicles with similar parts and/or components that would make sense to me. Maybe 117 Lariats in Azure Blue with all with the same package option. Once complete they would plan the next lot of '1254' (random) which would be a bunch of XLTs with a different color and different options.
This would also explain why some of us have waited longer than others to get a build date even if we ordered before them.
Just my $0.02